Search

Leave a Message

By providing your contact information to Darby Notario, your personal information will be processed in accordance with Darby Notario's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Darby Notario in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Darby Notario at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
Background Image

Ann Arbor's New Restaurant Row Sits One Block From the City's Biggest Dig in Years

September 24, 2026

Park in the Fourth & William structure on a Thursday night this month and you can walk to four restaurants that did not exist eighteen months ago without crossing a single lane closure. Park in Ann Ashley instead, a ten-minute walk north, and you are parking inside a construction zone that has been open to bedrock since March.

That is the part of this fall's downtown story that gets flattened every time someone says Ann Arbor is having its busiest construction season in years and its busiest restaurant opening season at the same time, as if the two facts describe the same three blocks. They do not. The digging and the dining are happening in different parts of downtown, on different streets, for different reasons, and knowing which is which is the only real trick to enjoying either one this season.

The Block That's Actually New

South Main Street between Liberty and William has absorbed more new restaurant openings in the past year than any comparable stretch downtown. Echelon Kitchen and Bar took the corner at 200 South Main with a wood-fired, vegetable-forward menu. Right next door, Tabe Fusion opened across three floors with an Asian fusion menu and a full omakase counter, fish flown in from Japan three times a week. Underneath Echelon, Huna turned a basement space into a tiki bar built around the idea of stepping away from the noise of the street above. A block over, above Jolly Pumpkin, chef James Park opened Bori Korean Kitchen and Bar, where the menu runs through dakgangjeong and dolsot bibimbap and there is a soundproof karaoke room in the back that seats eight.

Inside the new Vanguard Ann Arbor, a six-story hotel with 139 guestrooms that opened downtown this year, La Serre serves French-inspired brasserie fare as the hotel's signature restaurant. And the block's newest arrival is still finishing its buildout: Bev's Bagels, the Core City, Detroit shop known for its hand-rolled, kettle-boiled bagels, signed a lease for the space between Spencer and RoosRoast at 115 E. Liberty Street, aiming for a late summer or early fall opening. Chef Max Sussman started Bev's as a pop-up in Ann Arbor years before the Detroit shop existed, which makes this less an expansion than a homecoming.

Put together, that stretch of South Main and Liberty has turned into one of the more concentrated food corridors in the county, and it happened inside a single year.

Where the Digging Actually Is

Four blocks north, Ann Street tells a different story. The water main running under it is over a hundred years old and undersized for the neighborhood it serves, so the city is replacing it, resurfacing the road, and rebuilding the stormwater drainage from First Street to Fifth Avenue. Construction started in March and has moved west to east in three phases. Phase two, which closed the intersection of North Main and Ann Street, ran from July 29 through September 18, wrapping just days before this was written. Phase three, covering Main Street to Fifth Avenue, is underway now and is expected to run through November.

This is the corridor most people mean when they say downtown construction is bad this year, and the city has said as much itself, describing 2026 as one of the most active construction seasons downtown has seen. But Ann Street sits north of the restaurant row on South Main, closer to Kerrytown than to Liberty and William. The two projects share a season, not a block.

Two Downtowns, One Fall

South Main restaurant row Ann Street construction
Location Main St, Liberty to William Ann St, First to Fifth Ave
What's happening New openings: Echelon, Tabe Fusion, Huna, Bori, La Serre, incoming Bev's Bagels Water main replacement, road and stormwater rebuild
Timeline Ongoing, most openings within the past year Phase 3 running September through November 2026
Nearest parking Fourth & William, Fourth & Washington, Library Lane Ann Ashley (inside work zone, access via Ashley St)

Which Parking Structure Actually Gets You There

The Ann Ashley structure sits right inside the Ann Street work zone. It has stayed open through construction and remains accessible from Ashley Street or from Ann Street west of Main, but it is not the natural choice if dinner is the goal rather than the farmers market or Kerrytown. For the South Main restaurant row, three structures do the job without touching a barricade: Library Lane at 319 South Fifth, Fourth and Washington at 123 East Washington, and Fourth and William at 115 East William. All three sit within a few minutes' walk of Echelon, Tabe Fusion, Huna, and Bori, and none of them fall inside either phase of the Ann Street project.

The Weekend Closures Are Ending, Not Starting

Anyone downtown on a weekend since early June has already been navigating a different kind of closure, and it has nothing to do with the water main. A2 Summer Streets, run by the Main Street Area Association, closes portions of Main, Liberty, and Washington to vehicle traffic every weekend from Thursday afternoon through Sunday, turning those blocks into outdoor dining and pedestrian space. That closure schedule runs through September 28, which means it overlaps with the exact stretch where all the new restaurants have opened. The patio seating spilling out of Echelon and the sidewalk tables outside Peridot were built for a Main Street that already expects to be car-free on weekends this time of year.

That closure schedule is also about to end. Once September 28 passes, cars come back to Main Street on weekends just as Ann Street's third construction phase settles in for the fall, moving detours and lane closures toward Fifth Avenue through November. The Main Street Area Association also closed downtown to vehicles for one more occasion this month: the Street Art Encounter on September 11 turned sidewalks and street space into an open-air gallery with muralists working live from noon to sundown, a one-day marker for the close of the district's outdoor event season before the calendar shifts toward routine fall traffic.

What This Actually Means for a Fall Dinner Downtown

None of this requires avoiding downtown. It requires knowing that the sentence "downtown is torn up right now" is true of one street and not the other. If the plan is dinner at Tabe Fusion or a cocktail at Huna, Ann Street's construction has no bearing on the trip. Park at Library Lane or Fourth and William, walk in on foot the way A2 Summer Streets has trained everyone to do all summer, and the only thing that changes after September 28 is that Main Street opens back up to cars on weekends while the actual dig moves further from the restaurants, not closer.

The bigger story this fall is not that downtown is disrupted. It is that the two things happening downtown at once, one built to draw people in and one built to replace a century-old pipe, happen to sit close enough together that it is easy to confuse them. They are not the same project, and they are not on the same block.

If you already live in Ann Arbor, none of this changes your address. But if you are watching this stretch of Main Street the way The Darby Group does, as a sign of what a neighborhood is becoming rather than just what it is right now, it is worth paying attention to. A restaurant corridor this concentrated does not happen by accident, and it tends to say something about where people want to be next. If you are curious what that means for home values near downtown, or you're weighing a move into Ann Arbor yourself, our Ann Arbor neighborhood guide is a good place to start, or reach out directly and we will walk you through what we're seeing on the ground.

Follow Us On Instagram